17
Appendix D: List of Modules Table (see section 2.3)
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| ANOMALOUS TRANSPORT MODELS | |||
|
| |||
| IFS/PPPL, GLF23, MMM
|
|
¯¯ 0.5 Months [7pt] 0.25 Months [8pt] 1 Month [6pt] 2 Months 0.75 Months | |
| NEOCLASSICAL TRANSPORT MODELS | |||
|
|
¯¯ 1 Month [7pt] < 1 Month < 1 Month | |
| TRANSPORT EQUATION SOLVERS | |||
|
| |||
| e.g., given Te
return |
| ||
| diffusion-equation solver. Level II.
|
¯¯ 0 Month |
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| EQUILIBRIUM SOLVERS | |||
|
| |||
| solvers of all types
| |||
| module |
|
t |
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| NEUTRAL BEAM | |||
|
|
t | |
| NEUTRALS | |||
|
|
¯¯ 1 Month [10pt] 1 Month [6pt] |
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| LOWER HYBRID | |||
|
|
¯¯ 3 Months | |
| ICRH and | |||
| FAST WAVE |
|
|
¯¯ 2 Months [8pt] 3 Months [-3pt] 1 Month [6pt] 1 Month |
| ECH |
|
|
¯¯ 2 Months [8pt] |
| IMPURITY RADIATION | |||
|
| |||
| sections
|
|
t | |
| SYNCHRONTRON RADIATION | |||
|
|
< ¯ 1 Month [9pt] 1 Month |
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| PELLET |
|
|
¯¯ 1-2 Months |
| SAWTOOTH |
|
| |
| Language C. Level 1. |
¯¯ 1 Month | ||
| MHD STABILITY | |||
|
| ||
| JSOLVER. Fortran.
| |||
| Glasser; external coming soon). Level II. |
¯¯ 12 Months [7pt] 2 Months [8pt] 1 Month [8pt] 1 Month [-2pt] 1 Month [-2pt] 0.25 Months | ||
| TAE | |||
|
|
|
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| NUCLEAR REACTIONS | |||
|
| |||
| slowing down
|
| ||
| (given reaction rates)
|
¯¯ 1 Month [7pt] 1 Month | ||
| RUNAWAY ELECTRONS | |||
|
| ||
| (Putvinskii/Rosenbluth). Level I. |
¯¯ 0.25 Months | ||
| DIVERTOR/EDGE | |||
|
|
¯¯ 1 Month [7pt] 0 Months | |
| H-MODE PHYSICS | |||
|
| |||
| ELMs |
|
| |
| IMPURITY TRANSPORT | |||
| Currently included in GLF23, Multi-Mode and NCLASS (Neoclassical) modules (see TRANSPORT MODELS). |
| |
| MOMENTUM TRANSPORT | |||
|
Currently included in GLF23 and NCLASS (Neoclassical) modules | ||
| (see TRANSPORT MODELS). |
|
| MODULE | NEEDED BY | AVAILABLE FROM | EFFORT |
| DIAGNOSTICS | |||
|
| ||
| reflectometry
|
¯¯ 1 Month [7pt] 0.25 Months [7pt] 0.25 Months 1 Month | ||
| EQUILIBRIUM LINE-of-SIGHTS | |||
|
|
¯¯ 1 Month [9pt] 1 - 2 Months | |
| ALGORITHMS | |||
|
|
|
¯¯ 1 Month [7pt] | |
| NON - PHYSICS | |||
|
| |||
| namelist / control; data acquisition; data output; check-point / restart |
|
¯¯ 1 Month
[9pt]
> 1 Month
[7pt]
> 1 Month
[9pt]
2 Months
|