OH system

From LTX Wiki
Revision as of 17:35, 22 August 2019 by Dboyle (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Capacitor Banks

In L212 Must be safed according to procedure C-LTX-B-AP-OHPS-01 before access. Must be enabled ("Un-safed") before operating.

Charging Control Panel

All Supply Indicator Lights will be off when OH is safed or L212 breaker for the OH supply is opened. Some lights will be on when the supply is operating.

Discharge Control Software

LTX-Nibbler Labview 2014 “Fast scopes.lvproj” “Modulation Timer MDSplus.vi” or “Linear Duty Cycle Timer.vi”- values may need to be updated “Fast Scope RT vi Rev1.vi” and “Fast Digs Scopes.vi”