PPPL Engineering Procedures | ||
Topic | Number | Full Title |
MANAGEMENT | ||
Roles + Responsibilties | ENG-057 | Project and Governance Roles and Responsibilities |
Project Execution Plans | ENG-020 | Project Execution Plan |
Job Cost Estimating (WAF) | ENG-053 | Job Cost Estimate Development & Review |
Project Status Review Board (PSRB) | ENG-049 | Project Status and Oversight |
System Breakdown Structure + Risk | ENG-063 | System Breakdown Structure and Categorization |
Work Planning | ENG-032 | Work Planning Procedure |
Document + Record Numbering | ENG-061 | Engineering Design Document and Record Numbering |
Davis-Bacon | ENG-058 | Davis-Bacon Screening |
DESIGN | ||
Requirements | ENG-050 | Job Requirements Documentation and Control |
Design Reviews + Calculations | ENG-033 | Design Verification |
PPPL Engineering Standards | ENG-019 | PPPL Engineering Standards |
FMEA Guidelines | ENG-008 | Failure Modes and Effects Analysis |
RAMI Guidelines | ENG-007 | Reliability, Availability, and Maintainability (RAM) Modeling and Apportionment |
DOCUMENTATION | ||
Drawings | ENG-010 | Control of Drawings |
Specifications | ENG-006 | Preparation, Review & Approval of Technical Specifications |
Statements of Work | ENG-060 | Preparation, Review & Approval of Statements of Work |
OPERATIONS | ||
Test Plans | ENG-062 | Plannning and Performing Tests |
Procedures | ENG-030 | PPPL Technical Procedures |
Conduct of Operations | ENG-055 | Conduct of Operations |
Interlock Key Control | ENG-011 | Interlock Key Control |
T-Mods | ENG-036 | Control of Temporary Modifications |
Pressure Testing | ENG-014 | Hydrostatic and Pneumatic Testing |
Equipment Calibration | ENG-002 | Control of Measuring Test Equipment and Calibration |
Power Outage Nofication | ENG-022 | Scheduled Site Power Outage Notification |
Electrical Load Reduction | ENG-009 | Electric Service Load Reduction |
Preventative Maintenance | ENG-016 | PPPL Preventive Maintenance Program |
FABRICATION | ||
Travelers | ENG-059 | Process Plan/Traveler for PPPL Built Components |
Identification + Control of Items | ENG-012 | Identification & Control of Items |
Shop Safety | ENG-048 | Machine/Carpenter Shop Equipment Safety Checklists |
Welding + Brazing | ENG-037 | General Welding and Brazing Requirements |
Welding Materials | ENG-038 | Welding Materials Control |
COMPUTING | ||
Cybersecurity Incident Response | ENG-034 | Cyber Security Incident Response |
TRAINING | ||
Electrician Qualification | ENG-041 | Electrician Qualification |
Boiler Operator Qualification | ENG-042 | Boiler Operator Qualification |
Carpenter Qualification | ENG-043 | Carpenter Qualification |
HVAC Mechanic Qualification | ENG-044 | HVAC Mechanic Qualification |
Machinist Qualification | ENG-045 | Apprentice Machinist and Qualified Machinist Qualification |
Metal Fabricator Qualification | ENG-046 | Metal Fabricator Qualification |
Facilities Tech Qualification | ENG-047 | Facilities Technician Qualification |
FACILITIES + CONSTRUCTION | ||
Facilities Mission | ENG-051 | Facilities and Infrastructure Mission Readiness |
OPEX Projects | ENG-052 | Operating Expense (OPEX) Projects Prioritization and Administration |
GPP Projects | ENG-005 | General Plant Projects Administration |
Computer Center Work Control | ENG-039 | Computer Center Work Control |
Electrical Equipment Approval | ENG-023 | Electrical Equipment Approval |
Hoisting + Rigging + Lifting + Vechicle | ENG-021 | Program for Hoisting & Rigging, Forklifts, Manlifts, Special Purpose Vehicles, Utility Vehicles and Portable Equipment |
Digging | ENG-024 | Digging Permits |
FIRE SAFETY | ||
Fire and Life Safety Systems | ENG-026 | Fire and Life Safety Systems |
Fire Dampers + Doors | ENG-025 | Impairments of Fire Dampers and Fire Doors |